Scott Tallon Walker
 
 
 
 
 

Keele University Radiopharmaceutical Production Unit

stw
stw
stw
stw
 
 
 

 

2003 - 2005
Keele, Staffordshire ST5 5BG, UK

Client
Erigal UK
Area
900 sq.m



Project Location on Google Maps
Email link to this Page 

 

Keele is the first of the UK cyclotron building designed by Scott Tallon Walker. The facility incorporates a P.E.T. scanning dock designed with Alliance Medical to take a mobile P.E.T. scanner as well as a cGMP production facility for the radiotracer (F.D.G.) used in P.E.T. scanning. 

 

The brief was to design a building to house these complex requirements within a building which reflected the client’s company ethos as market leaders in quality and scientific ability in their field. 

 

The architecture clearly expressed two elements. A solid cube incorporating the cyclotron bunker, hot cells and plant areas is interlocked with a graceful glass pavilion which houses the people and patient spaces. The building was completed in 2005.